Dept for Business and Trade will publish fresh building materials price data on 7 October, as part of its wider building materials and components statistics, with figures running from bricks and cement through to ready-mixed concrete. If you are costing a new site, a refit or a simple refloor, this is the official data your builder’s quote should be checked against.
The release sits on gov.uk as an accredited official statistics announcement, tracking monthly price indices for bricks, cement and concrete blocks, plus quarterly figures for sand and gravel, slate, concrete roofing tiles and ready-mixed concrete. That is seven materials in total, and between them they cover most of what actually goes into a barbershop build-out: the shell, the floor, the render, the roof. The full detail sits with the Dept for Business & Trade, which runs the series monthly and quarterly rather than as a one-off snapshot.
Here is why this matters more than it sounds. A fit-out quote is only as good as the price the builder locked in when they wrote it, and materials costs move between the quote and the invoice. If the index has climbed since your builder priced the job, you are the one who eats the difference unless you asked for a fixed-price contract up front. Knowing which materials are moving, and by how much, gives you something concrete to push back with before you sign.
It matters most if you are opening a new chair or doing a structural refit, where bricks, blocks and concrete are a real line item. It matters far less if your next spend is cosmetic, new barbershop lighting or fresh shopfront signage, since those costs sit outside this data set entirely. And if you are a chair-renter rather than the person holding the lease, this is your landlord’s or your shop owner’s problem to track, not yours, though it is still worth knowing why a refit might be taking longer or costing more than promised.
Anyone who has watched rent and build costs climb on a desirable strip, as Dale Whitehouse found paying double for his spot on Upper Street, knows that fit-out costs do not sit still between the quote and the opening day. Material prices are one more variable in that same equation, and one you can actually check rather than guess at.
If a full rebuild is not on the cards, the cheaper route is to tighten what you already have. The sustainable barbershop checklist covers changes that cost nothing and still lift how the shop looks and runs, worth running through before you commit to a materials-heavy refit at all.
What to do next
- If you have a fit-out or refit planned, check the 7 October release against your builder’s quote before signing anything.
- Ask for a fixed-price contract on materials-heavy work, not a price “as of today”.
- If the job is cosmetic, redirect the budget towards lighting, signage or the no-cost changes instead of waiting on a bigger rebuild.





